Notes on delivering renewable energy projects well - what goes wrong between design and installation, and what it takes to close the gap.

Who Are You Trusting? 3 parts
  1. Part 1 29 September 2026

    A 10-year warranty. Will they be there in year 10?

    A 10-year warranty is more than a number on a datasheet. It is a promise made by an organisation. What should homeowners consider about the companies…

    Read more →

  2. Part 2 6 October 2026

    You paid for the battery. But where is it?

    What happens to your money between paying for a battery and having it installed? Three homeowner experiences reveal the fulfilment risk that does not appear on…

    Read more →

  3. Part 3 13 October 2026

    You paid for the equipment. Should your money be protected?

    Over the last two posts I’ve looked at risks homeowners rarely see when buying solar and batteries. So what should we do about them? Part of…

    Read more →

Life after handover 3 parts
  1. Part 1 8 September 2026

    600,000 systems. Nobody left to call.

    As at 31 July 2026, the Clean Energy Regulator records 4,501,887 small-scale solar PV installations in Australia. Australia crossed four million rooftop solar installations in November…

    Read more →

  2. Part 2 15 September 2026

    An installation warranty is only enforceable while the retailer exists.

    In my last post: Australia has passed four million rooftop solar installations, and more than 600 companies with “solar” in the name had entered liquidation or…

    Read more →

  3. Part 3 22 September 2026

    Ask who comes when it fails.

    Across my last two posts: more than 600 Australian solar companies liquidated or deregistered between 2011 and 2018, and an installation obligation that sits with the…

    Read more →

Battery installation quality 3 parts
  1. Part 1 19 August 2026

    The rebate worked. The installs didn't.

    Australia installed more than 460,000 home batteries in a single year. The federal battery rebate did exactly what it was designed to do - it created…

    Read more →

  2. Part 2 24 August 2026

    One state inspects every install. The rest don't.

    In my last post I shared that more than 6 in 10 inspected battery installs were rated substandard. Here’s something most people outside the industry don’t…

    Read more →

  3. Part 3 1 September 2026

    A safe asset, or a fire risk on a wall.

    Over my last two posts I’ve laid out the battery story: more than 6 in 10 inspected installs rated substandard, and one state – Victoria –…

    Read more →

Commercial installations 3 parts
  1. Part 1 28 July 2026

    The hardware is the predictable part

    Utility-scale solar lands within about 1% of budget — better than almost any other generation technology. So why does Australia's regulator find one in five rooftop…

    Read more →

  2. Part 2 4 August 2026

    Why installations fail

    One in five rooftop solar installations is substandard — but not because the industry lacks good people. The same issues come up again and again, and…

    Read more →

  3. Part 3 11 August 2026

    What actually closes the gap

    Three things separate a project that runs to plan from one that doesn't. None are complicated. All are easy to skip when a job is under…

    Read more →

Got a project that's hard to resource?

If you have commercial solar, battery or EV work coming up, we'd like to hear about it.